name change of stop place from Frohsinn to Bahnhof
name change of stop place from Frohsinn to Bahnhof
change of stop place B in April 2024
Change of stop place B in April 2024
change the layer from the crosswalk on the bridge to 1
change the layer from the footway on the bridge to 1
deleted the footway after construction
change the layer from the footway on the bridge to 1
Bus stopping edge "Ersatz" added
change position from the bus stop and uic_ref
Bus stop was renamed from Allmendstrasse to Allmend. (in 2014)
Bus stop was renamed from Allmendstrasse to Allmend. (in 2014)
added bus stop for railreplacement bus EV
added uic_ref, uic_name and line EV
added bus stop for railreplacement bus
change position of the waiting area from the bus stop after constructionswork
Deleted Level 0 for connectivity to stairs