-
Ptácká: rekonstrukce do 09/2018; Konevova: rekonstrukce do 08/2018; Dukelská: rekonstrukce do 06/2018
Closed
-
reconstruction III/2018-IX/218
Closed
-
repaired direction by present situation
Closed
-
removed trafic signals on the bridge - new bridge was build without trafic signals
Closed
-
added information according to reality (source: survey 25.07.2013)
Closed
-
repair
Closed
-
added information
Closed
-
added new information
Closed
-
added properties according to reality
Closed
-
repaired according to reality
Closed
-
actualise according to reality
Closed
-
actualised according to reality
Closed
-
repair bad position (other side of street) - I was there 10 days this Juli
Closed
-
modified traffic signal
Closed
-
Highway on valley floor below castle Mlada Boleslav is in reconstruction now.
Closed
-
actualised and added track according gpx
Closed
-
(no comment)
Closed
-
repaired part of sabotage (somebody ereased in reality existed and in openstreet map mapped objects)
Closed
-
repaired shape of road
Closed
-
added source to a few last time added or modified objects, added 3 beaches in Suchdol nad Lužnicí - Pískovna Tušť (malá + velká)
Closed