Loading...
Relation: Cycleway 3 (12239283)
Version #14
Castle Baynard Street reopened
Tags
colour | #93d50a |
---|---|
cycle_network | GB:London Cycleways |
from | Tower Hill |
name | Cycleway 3 |
network | rcn |
operator | Transport for London |
ref | C3 |
ref:colour | #93d50a |
ref:colour_bg | white |
ref:colour_tx | black |
route | bicycle |
tfl:programme | Cycleways |
to | Lancaster Gate |
type | route |
Part of
1 relation
- Relation Cycleway 3 (14081135) (as main)
Members
21 members
- Node 10653397577 as guidepost
- Way Blackfriars Underpass (415673760)
- Way Blackfriars Underpass (406518852)
- Way Blackfriars Underpass (406518853)
- Way Blackfriars Underpass (406518850)
- Way Upper Thames Street (406518847)
- Way Castle Baynard Street (1220283781)
- Way Castle Baynard Street (413045936)
- Way Upper Thames Street (413045940)
- Way Upper Thames Street (406520575)
- Way Upper Thames Street (406520577)
- Way Upper Thames Street (423243521)
- Way Upper Thames Street (406520572)
- Way Upper Thames Street (406520571)
- Way Upper Thames Street (847807748)
- Way Upper Thames Street (1185517535)
- Way Lower Thames Street (1185517536)
- Way Lower Thames Street (1126991805)
- Way Lower Thames Street (392307465)
- Way Byward Street (680571102)
- Relation Cycleway 3 (16635948)
Welcome to OpenStreetMap!
OpenStreetMap is a map of the world, created by people like you and free to use under an open license.
Hosting is supported by Fastly, OSMF corporate members, and other partners.
https://openstreetmap.org/copyright | https://openstreetmap.org |
Copyright OpenStreetMap and contributors, under an open license |