-
Improve menlo park 101 crossing
-
bike and foot path improvements on google campus connecting to vista slope.
-
Bridge was opened January 30th https://www.smcgov.org/parks/news/fitzgerald-marine-reserve-bridge-now-open
-
Allow bike access from Northbound San Antonio Platform to Mayfield Avenue via opening on the platform end.
-
Update cycling in Mori point: https://www.nps.gov/goga/planyourvisit/upload/Mori-Point-trail-map_2016-2.pdf
-
Open up certain cycle routes in Fruitvale area
-
This bridge is damaged and set to be reopened in February https://www.smcgov.org/fmr-storm-repair
-
Miranda Footbridge was opened on October 26, 2023. https://www.smcgov.org/publicworks/mirada-road-pedestrian-bridge-replacement-miramar-area
-
Set sharp cycle crossing on N California avenue to be 1 way to demonstrate that it has to cross traffic at an angle, add path into the street from the tunnel to the other side
-
Update bicycle path that now connects between Alta and Permanente Creek Trail. The Parking lot here is now half the size.
-
Add south bound cycle path to mimc north bound cycle path which should allow bicycle routing down this street instead of 1st which is more dangerous.
-
Update bicycle crossings on 7th street to indicate bike lights
-
Clarify cycle paths on the wiggle closer to the Panhandle on Fell St and Oak St
-
Mark great highway as foot and bicycle traffic on Friday 12PM - Monday 6AM, as per great highway pilot project: https://sfrecpark.org/1555/Great-Highway-Pilot-Project
-
Add path to connect Transverse Drive to JFK Promenade
-
Add walking and biking paths near Gradient Canopy
-
Add website and information about Google Cafe.
-
Walkway for employees only.
-
Mark Castilleja ave as bike blvd: https://www.paly.net/campus-life/getting-to-school#:~:text=Castilleja%20Ave.%20is%20also%20an%20official%20bike%20boulevard.
-
Westbound improvements to Bryant @ Embarcadero protected bike crossing.