-
Removed Under-construction tag from the tertiary road as per live data near 28.626278708820582, 76.9994057741011
-
modified the road connectivity at 31.41516566145278, 76.7672896897239
-
Modified the road connectivity for minor unclassified road 31.41107241475991, 76.7529916121022
-
Connected the minor unclassified road to trunk and added connector road as per the latest source of imagery
-
Added missing trunk road according to live data and removed underconstruction tag upto 31.299217988299343, 76.7459847978112
-
Added missing trunk road according to live data and removed underconstruction tag at 31.34643133727862, 76.73138950941234
-
Removed superfluos lines with relations
-
Modified the road connectivity for connector road and added direction to tertiary road near 31.32125050661995, 76.7370317871826
-
Added missing trunk road according to live data and removed underconstruction tag
-
Added new trunk roads at the junction of Shimla Kangra road with direction. Added connector as per satellite view
-
Added new trunk roads at the junction of Shimla Kangra road with bridge embankment and direction 31.397104692380783, 76.73090661950124
-
Added road number to NH205 stretch road
-
Completed one stretch od NH205 from kenchi mod tunnel point 31.23259961044308, 76.66383668938421 to 31.184850475703815, 76.57547472471909
-
Added dual channel road for nh205 and added connector
-
Added dual channel road for nh205 and added connector
-
Added missing road and modified the bridge tag for nh 205 as per imagery
-
Gave NH205 road number to the the trunk road related to it
-
Added tunnel at the trunk road near 31.23262234308658, 76.66383702160441
-
Removed the wrong connector road as per live data at 18.98743632962888, 72.84153885029784
-
Added tunnel at the trunk road