1. Add speed limits between Fremantle and Cottesloe. Also realign track between those stations.

    Closed · #151156289
    0
  2. Realign tracks and crossovers between Claisebrook and Victoria Park stations. Add speed limits, and check electrification standards.

    Closed · #151154464
    0
  3. Thornlie-Cockburn Link will be electrified with the same standards as the rest of the Transperth Trains network.

    Closed · #151150778
    0
  4. Except for crossovers and sidings, the Yanchep Rail Extension has a track speed of 130 km/h

    Closed · #150915262
    0
  5. Added date to Yanchep Rail Extension, added basic information on the electrification, fixed a spelling error

    Closed · #150915069
    0
  6. Add track speed to Joondalup line between Nowergup and Butler. Added date to Yanchep Rail Extension

    Closed · #150462193
    0
  7. Speed limits added between Joondalup and Nowergup. Alignments fixed.

    Closed · #150461779
    0
  8. Realign tracks and crossovers, add speed limits, based on aerial imagery and data from the PTA Rail Access Manual Rev 34.00. (Between Leederville Station and Joondalup Station)

    Closed · #150460753
    0
  9. Alignment of the Leederville Stowage Track edited. Max speed of the Joondalup Line between Perth Underground and Leederville corrected. Source for track speed: PTA Rail Access Manual Rev 34.00

    Closed · #150458792
    0
  10. Realign tracks and crossovers based on aerial imagery and data from the PTA Rail Access Manual

    Closed · #150456461
    0
  11. Ashfield to Midland Station. Realign platforms, tracks, and update track speed. Source for track speed: PTA Access Manual

    Closed · #148784638
    0
  12. Update track speeds between East Perth and Meltham. Source: PTA Access Manual

    Closed · #148782632
    0
  13. Track speed edits on the Midland Line around Claisebrook. Source: PTA Rail Access Manual

    Closed · #148782059
    0
  14. The max track speed of the underground portions of the Airport Line is 130 km/h, apart from sections close to Redcliffe and Airport Central stations, which are 80 km/h Source: PTA Rail Access Map

    Closed · #148780471
    0
  15. Consolidated elements into the Redcliffe Transit Stop Area

    Closed · #148780303
    0
  16. Mostly editing the Airport line track speed between Bayswater station and Bayswater Portal, and retagging a crossover. Main source: PTA Rail Access Manual

    Closed · #148779623
    0
  17. Add track speed to parts of the Airport Line Source: https://www.pta.wa.gov.au/Portals/15/AA_DOCUMENTS/About_us/Working%20with%20PTA/Safety%20resources/8800-400-001%20-%20Manual%20-%20Rail%20Access%20(RAM).pdf page 107 of 138 of the PTA Rail Access Manual

    Closed · #148778411
    0
  18. Minor edits to the Reid Highway PSP

    Closed · #91179078
    0
  19. minor edits to the Bayswater to Morley Safe Active Street

    Closed · #91178684
    0
  20. Minor edits to the Reid Highway PSP, reflecting new cul-de-sac connections

    Closed · #91177716
    0
Load more
Loading...