Road name expansion
-
Specify road surfaces
-
Specify path surfaces
-
Specify whether crosswalks have tactile paving
-
Specify path surfaces
-
Survey of construction at I-990 / Audubon Parkway, including new roundabout.
-
Clean up boundaries along Conodoguinet Creek that are very clearly trying to represent the same line.
-
Determine whether buildings are fully underground
-
Specify path surfaces
-
Specify whether crosswalks have tactile paving
-
Specify whether pedestrian crossings have islands
-
Add junction=roundabout and lanes=1 to roundabout at I-990 exit.
-
While the Bronx River Pathway is routed on the shoulder of a road, don't map a separate way for it. The configuration is expressed with sidewalk:right=lane.
-
Clean up parking aisles
-
Niagara Scenic Parkway Spur cleanup. Downgraded to secondary due to lower importance, and removed from the NSP route relation as there seems to be little to no signage of the actual name.
-
This has been under construction for several weeks now. This does not reflect the exact bounds of the construction, but at least properly shows that it is inaccessible from Millersport Highway
-
Change motorway to motorway_link on ramp
-
Playland Parkway classification and tag cleanup. Expressway construction is now denoted with expressway=yes, for the appropriate part of the road.
-
Downgrade SR-7 to primary, and instead denote limited access construction with expressway=yes.
-
Downgrade US-20 and US-6N from trunk to primary. If these roads are important enough to be trunk routes, the route should stretch all the way from city to city. These are just stubs.