1. Marviksveien er permanent enveiskjørt mellom Østre ringvei og Industrigata. This road is permanently made one-way, not just because of construction. I live in the area – please do not revert this edit again...?

    Closed · #129818722
    0
  2. Bridge at Tofteland is not under construction, only proposed. Reduced construction area to reflect this.

    Closed · #128781578
    0
  3. Sykkelvei under bygging (fra PlanID 1452). Endret tunneler til kulvert.

    Closed · #125659106
    0
  4. Anleggsområdet er større, og E 18-broa østgående får tre felter (2+akselerasjonsfelt). Vurder om delene som jeg har merket "construction" skal være det. De er under bygging men åpnes jo ikke før Ytre ringvei er ferdig. Jf. Mandalskrysset hvor deler fortsa

    Closed · #123210148
    1
  5. Minor edits after construction

    Closed · #122067749
    0
  6. Removed unused temporary diversion, streams usually flow downhill.

    Closed · #121577530
    0
  7. Marviksveien er nå enveiskjørt mellom Østre ringvei og Industrigata.

    Closed · #117997404
    0
  8. Removed remains of proposed 2nd part of extension of Fv. 456.

    Closed · #115305123
    0
  9. Minor adjustments, length of overpass/tunnel and road number references.

    Closed · #115304759
    0
  10. Fv. 455 is closed at Stusvik junction. Temporary road to link E 39 with 455 is completely removed.

    Closed · #115264316
    0
  11. Eastbound traffic diverted at Grauthelleren (checked in person). Also made minor adjustments to other links to match alignment in drawings.

    Closed · #115226928
    2
  12. Fixed typo

    Closed · #115069715
    0
  13. Moved Ytre ringvei to currently proposed alignment. Added motorway_links to relevant junctions. Added other proposed infrastructure unless in a very "crowded" place since final alignment of junctions and tertiary roads is subject to change.

    Closed · #115069583
    2
  14. Alteration in temporary diversion at Grauthelleren, reflecting actual situation.

    Closed · #115064837
    0
  15. E 39 Kolsdalen–Meieriet is not under construction, but proposed.

    Closed · #115059257
    0
  16. Only eastbound traffic was diverted on December 17th. There is also a bend in the diversion just before the petrol station but this might be very temporary.

    Closed · #115056225
    0
  17. Changed road type from motorway to trunk.

    Closed · #115056058
    0
  18. Changed placement of eastbound bus stop (it is south of ramp, not north), added temporary E 39 onto eastbound ramp and link west of western roundabout (due to underpass construction), added temporary cycleway and footpath.

    Closed · #114634251
    0
  19. E 39 link under construction Mandalskrysset–Ime is trunk, not primary. Newly opened link southbound through Mandalskrysset (until temporary connection towards Fv 455) is also E 39 according to NVDB but is kept as Fv 455 to avoid confusion until new E 39 a

    Closed · #110817367
    1
  20. Changed road number to reflect NVDB road numbering. Moved stream to approximate location pending completion of construction works.

    Closed · #110310008
    0
Load more
Loading...